Flexible job shop scheduling with overlapping in operations
By Parviz Fattahi, Fariborz Jolai, J. Arkat. 2009
101 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/50b736d6af7dd2a0399514da93f5298644c1c39f
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
Citations in the corpus
- A research survey: review of flexible job shop scheduling techniques (2016, methodology): “Fattahi et al. (2009) having 30 citations propose an SA algorithm to minimize makespan in an FJSSP with overlapping in operations.”