Project Scheduling with Time Windows and Scarce Resources
By Pascal Neumann, David Schwindt, P. Zimmermann. Springer Berlin Heidelberg, 2003
407 citations recorded by the source corpus.
Subfields: Building and Construction, Industrial and Manufacturing Engineering, Management Science and Operations Research
View Paper: https://www.semanticscholar.org/paper/49785074b5b9c6ef16c42064ebaad6a4145e8ae3
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
In Management Science and Operations Research
Citations in the corpus
- Project scheduling with finite or infinite number of activity processing modes - A survey (2011, background): “The objective is then to minimize the total renting cost (Neumann et al., 2002).”
- Planning and scheduling in the process industry (2002, background): “For a general discussion of such problems see, for instance, [56], [53] and [13].”
- Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources (2012, background): “These resources, described sometimes as cumulative by some authors [23], can be consumed (or not) at the start time of an activity in a certain amount and/or then produced in another amount at the completion time of this activity.”