The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
By Mohamed Ben-Daya. 2002
189 citations recorded by the source corpus.
Subfields: Management Information Systems, Safety, Risk, Reliability and Quality, Strategy and Management
View Paper: https://www.semanticscholar.org/paper/4176442be728d5eabf9abb27bf3b4361f0305c30
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Management Information Systems
- Liang-Yuh Ouyang
- Chun-Tao Chang
- Seyed Taghi Akhavan Niaki
- Amir Abbas Najafi
- A. A. Taleeizadeh
- Yung-Fu Huang
- Jinn-Tsair Teng
- Biswajit Sarkar
In Safety, Risk, Reliability and Quality
In Strategy and Management
- Liang-Yuh Ouyang
- Chun-Tao Chang
- Seyed Taghi Akhavan Niaki
- Amir Abbas Najafi
- A. A. Taleeizadeh
- Yung-Fu Huang
- Jinn-Tsair Teng
- Ata Allah Taleizadeh
Citations in the corpus
- Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging (2013, methodology): “Ben-Daya (2002) formulated an integrated model with joint determination of EPQ and preventive maintenance level under an imperfect process.”
- Economic production quantity model with repair failure and limited capacity (2013, unknown): “example, [7–12]).”
- ECONOMIC PRODUCTION QUANTITY MODEL WITH SCRAPPED ITEMS AND LIMITED PRODUCTION CAPACITY (2010, background): “E-mail: Niaki@Sharif.edu Received 16 March 2009; received in revised form 6 May 2009; accepted 21 June 2009 research has been carried out by Cheng [1], Chiu et al. [2], Chung [3], Lee and Rosenblatt [4], BenDaya [5] and Chiu and Chiu [6] to address the imperfect quality EPQ problem.”