Estimating the Standard Deviation in Quality-Control Applications
By Mahmoud A. Mahmoud, Robin Henderson, Eugenio K. Epprecht, William H. Woodall. 2010
100 citations recorded by the source corpus.
Subfields: Management Science and Operations Research, Statistics and Probability
View Paper: https://www.semanticscholar.org/paper/35ea2af260c52cf097863c0fbe9e438bedb66ef7
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Management Science and Operations Research
- Eugenio K. Epprecht
- Subhabrata Chakraborti
- Nesma A. Saleh
- Felipe Schoemer Jardim
- Mahmoud A. Mahmoud
- William H. Woodall
- Matthew J. Keefe
- Lorena D. Loureiro
In Statistics and Probability
- William H. Woodall
- Eugenio K. Epprecht
- Subhabrata Chakraborti
- Mahmoud A. Mahmoud
- Felipe Schoemer Jardim
- Nesma A. Saleh
- Lorena D. Loureiro
- L. A. Jones‐Farmer
Citations in the corpus
- The Difficulty in Designing Shewhart X̄ and X Control Charts with Estimated Parameters (2015, methodology): “In terms of relative e ciency, Mahmoud et al. (2010) strongly recommended against the use of the range-based estimator (̂1) because of its low e ciency compared with the other four estimators.”
- Effect of the Amount of Phase I Data on the Phase II Performance of S2 and S Control Charts (2015, background): “Maravelakis et al. (2002) stated that at least m = 200 subgroups are needed with sample sizes of up to 20 units and recommended therefore using larger sample sizes (n > 20) and taking 100 samples in phase I.”
- Two perspectives for designing a phase II control chart with estimated parameters: The case of the Shewhart Chart (2020, methodology): “The unbiased pooled estimator we use here has been highly recommended in the recent literature (see Mahmoud et al. 2010 and Saleh et al. 2015a, b).”
- Design and Analysis of Control Charts for Standard Deviation with Estimated Parameters (2011, unknown): “Mahmoud et al. (2010) studied the relative e ciencies of these estimators for di↵erent sample sizes n and number of samples k.”
- Another Look at the EWMA Control Chart with Estimated Parameters (2015, methodology): “Among the di↵erent forms of the pooled estimator, Derman and Ross (1995) recommended the use of ̂5, while Vardeman (1999) and Mahmoud et al. (2010) showed that ̂4 has the lowest MSE.”
- Shewhart control charts for dispersion adjusted for parameter estimation (2017, methodology): “For example, a commonly used estimator of σ0 in the Phase I control limit is the square root of pooled variances (also recommended by Mahmoud et al. (2010)), defined as Sp = √ S2p = √∑m i=1 (n − 1)S2i m(n − 1) = √∑m i=1 S2i m .”