An improved iterated greedy algorithm for the no-wait flow shop scheduling problem with makespan criterion
By Quan-Ke Pan, Ling Wang, Bao-Hua Zhao. 2008
122 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/35cc2c86c414a237bc196ad9c1b69863c4c70559