A fuzzy branch and bound-based transmission system expansion planning for the highest satisfaction level of the decision maker
By Jaeseok Choi, Abdurrahim El-Keib, TrungTinh Tran. IEEE Transactions on Power Systems, 2005
106 citations recorded by the source corpus.
Subfields: Electrical and Electronic Engineering, Safety, Risk, Reliability and Quality
View Paper: https://www.semanticscholar.org/paper/2e923d8c3f9eec13c69d24bae93278229a83e40e
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Electrical and Electronic Engineering
In Safety, Risk, Reliability and Quality
Citations in the corpus
- A method for transmission system expansion planning considering probabilistic reliability criteria (2005, unknown): “It is interesting to note that this system is the same as that produced using the deterministic approach with a bus reserve rate at load point BRR % for all load points [33].”
- Multi-Stage Flexible Expansion Co-Planning Under Uncertainties in a Combined Electricity and Gas Market (2015, background): “et al, 2005 [59] Propose a new transmission planning model for the highest satisfaction level of decision makers.”