NEW HEURISTICS FOR M-MACHINE NO-WAIT FLOWSHOP TO MINIMIZE TOTAL COMPLETION TIME
By Tariq A. Aldowaisan, Ali Allahverdi. 2004
144 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/2cb560e1aec0a3e8a4183f517b8d8ee7a050502a
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
Citations in the corpus
- Flowshop-scheduling problems with makespan criterion: a review (2005, background): “Aldowaisan and Allahverdi (1998) described the case in which once a job begins its processing on machine 1 of the production line, that job must continue without delay to be processed on each of the mmachines in line.”