An inventory model with deteriorating items, quantity discount, pricing and time-dependent partial backlogging
By Sotirios Papachristos, K. Skouri. 2003
169 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering, Management Information Systems
View Paper: https://www.semanticscholar.org/paper/1cb50f8d47fcaea32ffb11b26e2287651db749f0
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
In Management Information Systems
Citations in the corpus
- Optimal price and order size under partial backordering incorporating shortage, backorder and lost sale costs (2008, background): “Papachristos and Skouri (2003) consider the pricing and lot-sizing problem for infinite horizon when the supplier offers a lot size-based quantity discount on materials, time to deterioration is described by Weibull function and demand is backlogged at the hyperbolic rate.”
- The effect of preservation technology investment on a non-instantaneous deteriorating inventory model (2013, background): “[10], Papachristos and Skouri [11], Dye [12], Tsao and Sheen [13], Sarkar [14], Wang and Li [15] and Cai et al.”