Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach
By Zhiwei Zhu, R. Heady. 2000
114 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering, Management Information Systems
View Paper: https://www.semanticscholar.org/paper/19443065af44116cb2569d9b626d7a7d1e7f98ec
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
- Chi To Ng
- T. C. Edwin Cheng
- Ali Allahverdi
- Mikhail Y. Kovalyov
- Dong-Ho Lee
- Rubén Ruiz
- Morteza Mousakhani
- Eva Vallada
In Management Information Systems
Citations in the corpus
- A survey of scheduling problems with setup times or costs (2008, background): “Zhu and Heady (2000) addressed the R=ST sd = P w j E j þ P w j T j problem.”
- A tabu search algorithm for unrelated parallel machine scheduling with sequence- and machine-dependent setups: minimizing total tardiness (2013, background): “Also, Zhu and Heady [28] propose a mixed integer programming model for the problem of minimizing the sum of earliness and tardiness penalties.”
- Hierarchical production planning and scheduling in a multi-product, batch process environment (2007, unknown): “More recently, Zhu and Heady (2000) proposed a mixed-integer programming formulation for minimizing the job earliness and tardiness scheduling problem for a non-uniform parallel machine and set-up considerations.”