A scheduling method for Berth and Quay cranes
By Young-Man Park, Kap-Hwan Kim. OR Spectr., 2003
445 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/14aade3da3839c41a88905e8c839b62b10465ca6
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
- Jean-François Cordeau
- Gilbert Laporte
- Dirk Steenken
- Pasquale Legato
- Luigi Moccia
- Robert Stahlbock
- Stefan Voss
- Michel Gendreau
Citations in the corpus
- Models and Tabu Search Heuristics for the Berth-Allocation Problem (2005, methodology): “More recently Park and Kim (2003) have introduced a non-linear integer programming model that also considers quay crane assignments.”
- Container terminal operation and operations research - a classification and literature review (2004, background): “Park and Kim [154] discuss an integer programming model for scheduling berth and quay cranes and propose a two-phase solution procedure.”