Minimizing the maximum travel time in a combined model of facility location and network design
By Iván A. Contreras, Elena Fernández, Gerhard Reinelt. 2012
77 citations recorded by the source corpus.
Subfields: Building and Construction, Industrial and Manufacturing Engineering, Organizational Behavior and Human Resource Management
View Paper: https://www.semanticscholar.org/paper/116def3fbe117d4fff04b6758d7eb3417ef6b39b
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
In Organizational Behavior and Human Resource Management
Citations in the corpus
- Why locate manufacturing in a high-cost country?: A case study of 35 production location decisions (2017, background): “Time is essential. clockspeed; lead time; quickresponse manufacturing; timebased competition Blackburn (2012); Contreras et al. (2012); de Treville et al. (2014); Ferdows et al. (2004); Fine (1998, 2000); Holweg et al. (2011); Suri (1998); Stalk (1988) Decision Understanding the actual decision…”