Parallel machine scheduling to minimize total tardiness
By F. Yalaoui, Chengbin Chu. 2002
128 citations recorded by the source corpus.
Subfields: Computer Networks and Communications, Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/0bf58e47406b9b3eb450a9c284ff977fe8acc7ed
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Computer Networks and Communications
In Industrial and Manufacturing Engineering
Citations in the corpus
- A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness (2004, methodology): “These results are consistent with those from studies of Azizoglu and Kirca (1998) and Yalaoui and Chu (2002) for identical parallel machine scheduling problems.”