Risk averse optimal operation of a virtual power plant using two stage stochastic programming

By Mohammad Amin Tajeddini, Ashkan Rahimi-Kian, Alireza Soroudi. 2014

172 citations recorded by the source corpus.

VPP (Virtual Power Plant) is defined as a cluster of energy conversion/storage units which are centrally operated in order to improve the technical and economic performance. This paper addresses the optimal operation of a VPP considering the risk factors affecting its daily operation profits. The optimal operation is modelled in both day ahead and balancing markets as a two-stage stochastic mixed integer linear programming in order to maximize a GenCo (generation companies) expected profit. Furthermore, the CVaR (Conditional Value at Risk) is used as a risk measure technique in order to control the risk of low profit scenarios. The uncertain parameters, including the PV power output, wind power output and day-ahead market prices are modelled through scenarios. The proposed model is successfully applied to a real case study to show its applicability and the results are presented and thoroughly discussed.

Subfields: Electrical and Electronic Engineering

View Paper: https://www.semanticscholar.org/paper/06b06660d8296721c8d7839f348fef3cc1ce9cd3

How researchers see this paper

The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.

In Electrical and Electronic Engineering

  1. M. Sheikh‐El‐Eslami
  2. Anastasios G. Bakirtzis
  3. Christos K. Simoglou
  4. Evaggelos G. Kardakos
  5. Saeed Rahmani Dabbagh
  6. Tomaso Erseghe

Citations in the corpus