Hybrid flow shop scheduling considering machine electricity consumption cost
By H. Luo, B. Du, George Q. Huang, Hua-ping Chen, Xiaolin Li. 2013
368 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/06232b996e9dabbf019fd59a1e8710952ab5e3d5
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
Citations in the corpus
- Energy-efficient scheduling in manufacturing companies: A review and research framework (2016, background): “The attributes in this category are “machine turn on” (e.g., Shrouf et al., 2014), “machine idle” (e.g., Luo et al., 2013), “machine setup” (e.g., Eren & Gautam, 2011), “machine turn off” (e.g., Liu et al., 2014b), and “material storage” (e.g., Halim & Srinivasan, 2009).”